Where does the NeuBeam process come from?
Co-founders Will Richardson and Ian Laidler started working on the topic in 2016. Laidler brought long experience from electron-beam lithography in the semiconductor industry. Their target was the smoke event: electrons charge the powder, which then scatters and ruins the thin layer just spread. Development and venture funding took the team from a prototype to an independent machine builder. The result is NeuBeam, running on the Calibur3 electron-beam powder bed fusion system.
Why does a loose powder bed matter?
Conventional electron-beam machines sinter the whole powder bed into a lightly bonded cake so it stays in place. Operators must hold it between too loose and too hard to break away. With charge neutralised, the powder does not need that sintering, so the part can run hot while the powder around it stays loose.
Richardson names three effects. In crack-prone nickel superalloys such as CM247, a hot build helps while cooling channels as small as 1 mm remain clearable. In titanium, finer, porous supports that break away may be possible, sometimes with a thinner substrate and no separate stress-relief step. Some steels can be built cooler to protect corrosion resistance or to reach hardness straight off the machine, which can remove a heat treatment depending on the specification.
Where does electron beam fit against laser?
Richardson would leave aluminium and thin-walled, lightweight parts that already print reliably to laser systems. His openings are bulky sections that distort, alloys that crack, and long waits for titanium castings. Electron beam asks more of the engineer, who controls part temperature as well as the beam. Building the machine is harder too, as no supplier sells electron beam columns off the shelf.
The beam can also cycle quickly between points to sustain 16, 24 or 36 melt pools at once, keeping small-pool definition while working in parallel. With Fraunhofer IFAM in Dresden, Wayland produced dense, crack-free tungsten demonstrators; fusion energy is seen as a target market.
What is the adoption evidence?
In August 2025 the RAF reported that an operational Typhoon had flown with a replacement metal part made in-house on Calibur3. Richardson put the route to that milestone at under two years, including machine qualification and destructive and non-destructive testing, and expects later programmes to be shorter. He gave no installed-base number, but says early customers now make production parts and reorder machines. A US applications facility is planned. Wayland exhibits at Formnext, Hall 12, Stand B139.