How the hybrid structure divides the building
ICON designed the facility and prints its walls with the Vulcan construction system. The open, steel-framed section will hold heavy machinery, while the printed portions enclose areas where visitors and staff gather, work and train. A 100-foot run of overhead doors will link the training floor to ASCO's outdoor demonstration field. Tiered seating sits inside the printed enclosure, an upstairs lounge overlooks the machines, and a translucent facade brings in daylight.
What is known about cost and schedule
ICON has not disclosed the construction cost or compared it with a conventionally built facility. An October 2025 state filing for an earlier version of the project listed a 12,000 sq ft building at an estimated $4.5 million with completion in December 2026. The new announcement raises the area to 12,649 sq ft and moves completion to summer 2027, without an updated cost. Printing began in November, with steel and conventional work continuing.
Where it sits in ICON's work
ICON calls this its first commercial project to fully use its design-build model and its first printed building in San Antonio. Earlier work includes a housing community in Tabasco, Mexico, with New Story, vehicle-hide structures for US Marines at Camp Pendleton, and the 100-home Wolf Ranch development with Lennar. In March 2026 ICON launched its Titan platform for direct sale to builders.